In a world where every inch of land matters, we are the bridge between geotechnical innovation and the safety of your structures. Explore with us solutions that anticipate risks and raise standards.
Where Innovation Meets Solid Ground
We Turn Challenges into Safety.
Integrated Management
- Leadership and coordination of the entire instrumentation operation, from installation to data analysis.
- Market analysis and support in supplier selection.
- Monitoring the project’s financial performance.
Technology for monitoring and decision-making.
WEBGEOM
• Automatic review of results
• Virtual sensor generation
• Risk alarms and notifications
• Ubiquity with secure access routing
• Data export compatible with conventional tools (ASCII, .xlsx)
• Integration with higher-level software systems (SCADA)
• Topographic and non-topographic instrumentation.
• Automated data acquisition and manual readings.
CCR
• Continuously acquires, transmits, and stores equipment readings.
• Automatically detects risk situations and sends alerts.
• Enables real-time visualization of monitored parameters.
• Provides tools for analyzing stored readings.
* Property of the construction company ACCIONA. geprode contributes through functional analysis, validation, pilot testing, and ongoing optimization.
Committed to Exceeding Expectations.
- Success Stories
Every project is a story of overcoming challenges.
We transform complex geotechnical challenges into success stories, strengthening structures and ensuring our clients’ peace of mind.
- Innovation in Every Layer
Technology is our fertile ground.
We continuously invest in research and development to deliver the most advanced solutions in geotechnical monitoring and data analysis.
- Quality and Sustainability
Doing it right is not enough; it must also do good for the world.
Our commitment is to operational excellence that respects the environment and contributes to a more sustainable future.
Our Team Is Made Up of Specialists.
CEO / Founder
Roberto Collado
Geologist – Specialist in geotechnical instrumentation and tunnels.
Master’s degree in e-Commerce.
27 years of experience
CTO / CFO
Mónica Calle
Senior Telecommunications Engineer – Specialist in Business Models, Lean Startup, and Financing
19 years of experience
COO
David Mendi
Geological Engineer – Specialist in geotechnical instrumentation and tunnels
19 years of experience
Senior Back-End Developer
Dario Woloszin
Python, Machine Learning & Data Science. Specialist in 5G & 4G and Google Earth
Instrumentation Technician
John Cliford
Civil Engineer specializing in property valuation.
Projects / Instrumentation
Cíntia Faria
Instrumentation Projects Assistant
Machine Learning and Artificial Intelligence Specialist
Jean-Yves Roulet
Physical and Mathematical Engineer.
Mid-Level Front-End Developer
Nilton Rocha
Degree in Marketing, Systems Analysis and Development
FullStack Developer
Debora Rodriguez
Degree in Systems Analysis and Development
27
204
77
Our secret lies in the integration of science and data.
Technical team with extensive experience in large-scale projects.
São Paulo Metro Line 6
Line 6 – Orange Line
São Paulo – Brazil
Acciona
2021 – under construction
- 16 km of tunnel
- 15 stations
- 16 shafts
Quito Metro Line 1
First Metro Line
Quito – Ecuador
Acciona
2013 – 2021
- 22 km of tunnel
- 15 stations
- 14 shafts
Driving Line in Ecuador
Pradera Pumping Main
Guayaquil – Ecuador
Bessac – Sade – Soletanche Bachy Cimas
2019 – 2020
- 4 km of tunnel
- 5 shafts
L.A.V.
Madrid – Galicia
Puebla de Sanabria / Ourense Section
Northern Access to Vigo
Spain
Ferrovial – Coprosa – Isolux – Sacyr – Copasa – ACCIONA – FCC
2011 – 2015
- 5 tunnels in operation
- Compensation grouting
L.A.V.
Madri / Levante
Cuenca – Valencia Section
Spain
FCC – Sando
2006 – 2007
- 8 km of tunnels
L.A.V.
León / Astúrias
Pola de Gordón – Folledo Section
Spain
Acciona
2021 – under construction
- 22 km of tunnels
L.A.V.
Madrid / Valladolid
HSL Madrid – Segovia – Valladolid
Soto del Real – Segovia Section
Spain
FCC – Ferrovial – ACS
2003 – 2004
- 28 km of tunnels
L.A.V.
Madrid / Zaragoza
HSL Madrid – Zaragoza – Barcelona – French Border
Lleida – Martorell Section
Spain
FCC – COMSA – SACYR – ACCIONA – OHL – Ferrovial
2001 – 2004
- 25 km of tunnels
Madrid Metro
Madrid Metro Expansion
Lines 7, 5, 10, MetroSur, 3, 2, Metro Norte Madrid
Spain
ACCIONA – FCC – Ferrovial – OHL – VIAS
1995 – 2007
- 46 km of tunnels
- 35 stations
We Work with Major Brands
Technical team with extensive experience working with private and public clients.











